Our Room Is Done
After almost 2 months of continuous work, the exterior of our park model addition is complete. This Winter or next Spring we’ll finish the interior.
Some photos from the final days of construction . . .
Mar 28
After almost 2 months of continuous work, the exterior of our park model addition is complete. This Winter or next Spring we’ll finish the interior.
Some photos from the final days of construction . . .
Mar 26
We particiaped in the 4th Annual Table Mesa Jeep Jamboree at the end of February. Yes, I know, we’re a tad bit late posting about our adventure, but we’ve been working on our park model addition (We’re done! More later.)
Anyway, we arrived at the Boulder Canyon Campground on Thursday, February 28 and set up camp.
REGISTRATION
Registration for the Jamboree was at 5 pm on Thursday night, so we decided to get to the registration site a little early.
However, it wasn’t early enough as we ended up at the end of line of over 100 Jeeps . . .
While we waited in line, I checked out the Jeeps . . .
. . . and Jan talked with some Newbies . . .
DAY 1 TRAIL RIDE
We opted for the easiest trail with 11 other Jeepers . . .
It was a beautiful morning . . .
CASTLE HOT SPRINGS RESORT
To me this was the high point of our trip. This desert resort first opened in the early 1900’s. A fire destroyed it in the 1970’s, and this October it will reopen.
Rooms start at $660 a day.
Our Jeep trip ended when we reached Lake Pleasant.
Feb 13
We’ve been working on our new room addition for about 3 weeks which is the reason for my lack of blog posts (until lately).
At first the progress was fast — probably because I had a lot of energy, but slowed down after I put up the three frame walls.
Here’s a photo log of those 3 weeks . . .
THE WEATHER HAS BEEN LESS THAN PERFECT
While it’s not hot, it has been rainy and now cold (for us).
SUPPLIES ARRIVED
For a small room, a fair amount of lumber is required. As it turned out, I under-estimated my 2 x 4 needs by about 50%.
This is where our Jeep came in handy . . .
MOVING & EXTENDING & FRAMING
ODDS & ENDS
The “minor” tasks can chew up a lot of, if not the most, time and energy . . .
CLOSET ROOF UP
The small roof that covers our room addition’s closet was next to go up. The roof was in two parts — each part 3/4″ plywood covered with an RV “rubber roof”. Actually, it’s some sort of synthetic material called Superflex. The Superflex is glued onto each sheet of plywood using a water-based adhesive that we’re pretty sure is Elmer’s Glue.
Anyway, we used a paint roller to spread the Elmer’s Glue all over each plywood sheet, then used a padded squeegee to flatten out the Superflex and remove all the air bubbles. For the most part it worked out ok.
After letting the Elmer’s Glue dry for a day, we next attached a brown-colored water drip edge.
Finally, both sections of the rubber roof are fastened to the roof rafters.
ONE WALL UP
After attaching the rubber roof, next step was to put up the closet’s exterior panels.
WHAT’S NEXT?
The door, sliding door, and two windows will arrive over the next month.
So I have to prepare a frame for each window, put up the room’s roof, and sheath the remaining two walls.
RANDOM MOMENT . . .
Feb 10
A Public Service Announcement . . .
Catch the Fab Four’s USA TV debut on Stephen Colbert’s :ate Show on Monday, Feb 11th and/or on Good Morning America’s Tuesday morning show.
And, finally, Blackpink is a headliner at this year’s Coachella, April 12th & 19th:
Feb 9
The shade in our RV skylight broke last summer. We took it down and told ourselves we’d repair it next week.
Many many weeks later we bit the bullet and restrung our RV skylight shade.
Bought new shade string on Amazon, but, unfortunately, removed the old string from the shade before taking a picture of how to run the string through the shade. Big mistake.
After trying to restring the shade for about 5 minutes, my patience expired.
Luckily, Jan was up for the challenge and figured it out pretty quickly.
I did the RV installation.
A RANDOM MOMENT . . .
I’ve walk Flirt passed this dummy several times, but her reaction never changes . . .